In the top picture, the stucco is up to the scratch coat. They should have the finish coat on by the end of the week. The picture below is a shot toward the Strip from the third froor 0utdoor kitchen. The final picture is looking down the temporary stairs. The elevator hasn't been installed yet either (no, not joking).
30 September 2008
Project in Las Vegas
In the top picture, the stucco is up to the scratch coat. They should have the finish coat on by the end of the week. The picture below is a shot toward the Strip from the third froor 0utdoor kitchen. The final picture is looking down the temporary stairs. The elevator hasn't been installed yet either (no, not joking).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment